.jpg)
SRON 6000ton
cement silo with whole set auxiliary equipment are loading on truck to deliver to Indonesia at our factory this week. All the hot galvanized steel plate are well packaged into diameter 1080mm, width 500mm coils. All the silo stiffener and steel structure are with pre-painting in our factory before delivery. The aeration boxes are packaged by plastic film. All the valves, level meter, electronic component are well packaged by box.